Commercial & Residential Demolition Project Gallery

The Billy Nabors Demolition team can complete any type of demolition project you need, from general commercial and residential demolition to selective demolition projects and emergency demos. Take a look at some of our top projects here. Call us today to learn more about our work or to begin your commercial or residential demolition project.

Project Maridoe Golf Club
Location Carrollton, Texas
Square Footage 25,000SF
Services Provided Total Building Demolition, Selective Demolition
Maridoe Golf Club Demolition

Services Provided Total Building Demolition, Selective Demolition Brief Description Demolished half of the east side of the clubhouse and a patio on the back of the clubhouse which housed a bar and grill area.

Project Amon G. Carter Stadium
Location Fort Worth, Texas
Square Footage
Services Provided Total Demolition, Selective Demolition
Amon G. Carter Stadium Project

December 5th, 2010, the West side of Amon G. Carter stadium was imploded. In January of 2011, the East side of the stadium was able to be demolished with excavators. The entire demolition and rebuild was completed before the football season started in fall of 2011.

Project Carlton Hotel
Location Tyler, Texas
Square Footage 115,000SF
Services Provided Selective Demolition
Demolition at the Carlton Hotel

Demolished the whole interior of a historical multistory hotel building for redevelopment into a mixed use space.

Project Mayfair Building
Location East Texas
Square Footage 5,000SF
Services Provided Selective Demolition
Mayfair Demolition Project

The Mayfair Building at The East Texas State Fair was built in 1927 as a multipurpose venue referred to as the “Opera House”. As one of the most historic buildings in the city, there was a great effort to save portions of the building for renovations. This project consisted of careful selective demolition in order to maintain the facade and integrity of the original building.

Project 101 Academy
Location Fort Worth, Texas
Square Footage 670,000SF + 30 Acres of Flatwork Removal
Services Provided Total Building Demolition, Concrete and Pavement Demolition
101 Academy Demolition

Demolished three large, steel structure buildings along with asphalt, concrete and paving. Each of the buildings were highly secured steel and concrete layered structures with quarter inch steel wrapping each building on roof level and each structural floor level. Its previous use required state of the art security and protected networks.

Project Ambassador Hotel
Location Dallas, Texas
Square Footage
Services Provided Emergency Response, Total Demolition
Brief Description

This historic hotel building

Project John Tyler High School
Location Tyler, Texas
Square Footage 523,000 SF
Services Provided Selective Demolition, Interior Demolition
Demolition at John Tyler High School

Project Rocketship Elementary
Location Fort Worth, Texas
Square Footage 50,000SF
Services Provided Selective Demolition
The Rocketship Demo

Total interior demolition of an existing educational facility to convert the building to an elementary school.

Project Labatt Foods
Location Dallas, Texas
Square Footage 30,000 SF
Services Provided
The Labatt Foods Demo

Demolished a portion of the building for a new building addition, interior demolition in another location of the building. The remainder of the building remained occupied and business operations continued as usual.

Project FritoLay
Location Irving, Texas
Square Footage 155,000SF
Services Provided Selective Demolition
The Frito Lay Project

Demolished the loading dock, a portion of the exterior walls and flatwork in preparation for the build of a new production wing.

Project Colonial Country Club
Location Fort Worth, Texas
Square Footage 15,000 SF
Services Provided Selective Demolition, Total Demolition
The Country Club Project

An older existing building addition to the clubhouse was separated from the portion of the clubhouse that is to remain and demolished to make way for a new addition.

Project Bushman Elementary
Location Dallas, Texas
Square Footage 75,000SF
Services Provided Total Building Demolition
The Bushman Demo

Total demolition of an elementary school, parking lots and playgrounds. Under the building was a large crawlspace that required dirt to be brought in and the area backfilled.

Call Nabors Demolition today to begin your commercial or residential demolition project in the Dallas area.